TY - JOUR N2 - This study has estimated the supply augmentation of groundwater recharge due to creation of water harvesting structures and has assessed the cost-effectiveness of rainwater harvesting for groundwater recharge on watershed basis in one of the sub-watersheds of the Kolar district, Peninsular India ? a typically hard-rock area. The study is based on the primary data for the year 2008-09 collected from a sample of 90 farmers having irrigation bore-wells in the selected watershed named Thotli. The study has indicated that the annual draft of irrigation water exceeds the annual recharge, causing a negative balance. On an average, the returns per rupee investment have been found to be ` 1.80 on farm pond, ` 1.78 on recharge pit and ` 1.39 on field bund. The cost incurred to impound a metre cube of water has been found as ` 3.01 in the case of field bund, where estimated recharge benefit is 5.6 m3, ` 1.67 /m3 in the case of recharge pit (with an estimated recharge benefit of 720 m3), and ` 1.33 /m3 in the case of farm pond (recharge benefit of 1350 m3). The discounted cost-benefit analysis of the investment on water harvesting structures has indicated that the investment on water harvesting structures is cost-effective and financially-viable. AV - restricted KW - Rainwater harvesting KW - Economic feasibility KW - Groundwater recharge KW - Watershed A1 - Nagaraj, N A1 - Pradhani, U A1 - Chengappa, P G A1 - Basavaraj, G A1 - Kanwar, R TI - Cost Effectiveness of Rainwater Harvesting for Groundwater Recharge in Micro-Watersheds of Kolar District of India: The Case Study of Thotli Micro-Watershed UR - http://indianjournals.com/ijor.aspx?target=ijor:aerr&type=home JF - Agricultural Economics Research Review Y1 - 2011/// ID - icrisat5447 SN - 0974-0279 VL - 24 PB - Agricultural Economics Research Association ER -